Marlborough Airport Extension

4 Marlborough Airport Extension 27
4 Marlborough Airport Extension 27

The terminal upgrade and extension to the Marlborough Airport almost doubles the size of the building.

The terminal upgrade and extension to the Marlborough Airport almost doubles the size of the building.

The terminal upgrade and extension to the Marlborough Airport almost doubles the size of the building with the addition of 552m² of floor area. Works include a separate rental car area, new offices, an improved covered baggage claim area, and a larger passenger lounge. Construction works was undertaken in three stages: Rental car booths, Airside to south, then Landside to north.

Marlborough Airport can now accommodate about 250,000 people a year, a significant increase from the 100,000 capacity of the original terminal. The upgrade opens up the opportunity to showcase the region.

3 Marlborough Airport Extension 11
1 Marlborough Airport Extension 16